The Cost of Downtime
Every closed room in a mid-scale hotel represents $80–$200 per night in lost revenue. A 200-room bathroom renovation taking 6 weeks per floor can cost over $160,000 in lost revenue alone.
Fast-Install Advantage
SPC wall panels install 30–40% faster than tile-and-grout. A standard hotel bathroom can be boarded, trimmed and sealed in one day versus 3–5 days for tiling.
Phased Renovation
Panels allow floor-by-floor or wing-by-wing phasing. Guests on completed floors experience no noise or dust, while work proceeds on other levels.
Durability for High Turnover
Waterproof, impact-resistant surfaces withstand luggage carts, cleaning chemicals and frequent tenant changes — reducing maintenance cycles between guests.
Consistency Across Rooms
Factory-matched colour batches ensure every room in a 200-key property looks identical — critical for brand standards and guest reviews.